Missouri River Operating Plans Available
Ahead of fall public meetings, the Draft Missouri River Mainstem Reservoir System Annual Operating Plan for the 2023-2024 runoff season is now available for public comment.
The Missouri River Water Management Division has made the draft 2023-2024 Annual Operating Plan available at: https:// www.nwd. usace.army.mil/ MRWM/ Public-Meetings/.
The public comment period on the draft plan will close Nov. 30.
Included in the plan is the possibility for test flows from Fort Peck Dam.
“The purpose of the test flows is to evaluate the potential for achieving pallid sturgeon spawning and recruitment in the upper Missouri River using periodic forecast releases that better replicate historic flows and temperatures and would be conducted to comply with the 2018 Biological Opinion,” said John Remus, Missouri River Water Management Division chief. Staff from the Omaha District will be available at the public meetings to answer questions related to implementing and monitoring of potential test flows.
The dates and locations of the meetings include: Nov. 7, Poplar at 10 a.m., Fort Peck Community College, 605 Indian Ave.
Nov. 7, Bismarck, N.D. at 5 p.m. CT – Bismarck State College, National Energy Center of Excellence (NECE), Bldg. 15, Bavendick Stateroom 1200 Schafer St.